Daily Job Report headline on construction orange beside a real one-page Excel report on a clipboard

What it does

One row per working day on the Daily Log: work done, crew and times, weather, materials, equipment, a problem, a visit or inspection, safety, photos, the next day and what the client must decide.

Choose a date and a job and the Daily Report writes that day in plain sentences on one printed page, with a short text for the client under it. The Running Log lists every day of a job with its crew hours and hours lost.

Includes an Excel worked example, a blank workbook and a one-page fillable PDF form in US Letter and A4. Microsoft Excel desktop for Windows was used for checks; other spreadsheet apps are untested. The PDF form is separate and does not sync with Excel.

A real example

Days logged, Miller job
12
Crew hours
262.0
Crew hours lost
5.5

Fictional jobs of Ridgeway Remodeling, October 2026: 17 logged days on two jobs. The Miller kitchen remodel has 12 days, 262.0 crew hours and 5.5 crew hours lost; the report shown is its October 13 page.

Made by Hamza Afridi

I run Forms and Sheets. If you have a question about this file, you can email me. Email Hamza

What is inside

SectionWhat it does
Start HereSix setup steps and practical notes
Daily LogOne row per working day and job: the facts, from work done to what the client must decide
Daily ReportChoose a date and a job: one printed page in plain sentences, plus a text for the client
Running LogEvery logged day of one job in date order, with its totals
JobsJob name, number, client, first name for texts, address and lead
SettingsYour company details, unpaid break, temperature unit and the choice lists

Questions

What does it write for me?

Each Daily Log row becomes one printed page in plain sentences: crew and hours, weather, work done, materials, equipment, problems, visits and inspections, safety, the next working day and what you need from the client. It also writes a short text for the client and lists every day of a job in a running log.

Do I have to fill every column?

No. Date, job and work done are enough. Empty notes show as "None recorded" on the report and are left out of the text for the client.

How are crew hours worked out?

People x (end time - start time - unpaid break). Set the break on Settings; the example uses 30 minutes.

Can I change the choices?

Yes. The weather, weather effect, problem, visit, inspection result and safety lists are on Settings. Keep the first choice of Problem, Visit and Safety as the nothing-to-report choice.

Can I send the report to my client?

Yes. Print the page or save it as a PDF (Ctrl+P), and copy the text for the client into a text or email. Read it before you send it.

Does the PDF form sync with Excel?

No. The fillable PDF form (US Letter and A4) is a separate form for paper or a tablet.

Which software do I need?

Microsoft Excel desktop for Windows was used for all checks. No macros. Other spreadsheet apps are untested. Use a PDF reader with form support for the PDF form.

What files do I receive?

An Excel worked example, a blank Excel workbook, and the fillable PDF form in US Letter and A4. Four files in total.